By 2014, the mall spent approximately HK$400 million on major renovation projects and was fully opened on November 18, 2017. The renovation project was designed by well-known local architects Ho Chow Lai and P&T Group.
The original outdoor open space on the third floor was recovered as a retail shop, and the fourth floor was changed into a large outdoor open plaza covering an area of 40,000 square feet, with seasonal There are 5 new themed facilities including the themed flower sea, adventure park and urban farm. An outdoor alfresco dining area is also provided. South Star Glass provides IGU for exterior walls.